Risk Analysis of Construction Work for the Construction of Gilmanuk - Mengwi Toll Road, Bali Province

Authors

  • AA Bagus Oka Khrisna Surya Politeknik Transportasi Darat Bali
  • Surya Aji Ermanto Politeknik Transportasi Darat Bali
  • Dinda One Mulyaningtyas Politeknik Transportasi Darat Bali
  • A.A Gde Sanjaya Putra Politeknik Transportasi Darat Bali

DOI:

https://doi.org/10.52920/jttl.v4i1.95

Keywords:

mitigation, risk, toll road

Abstract

Risk is the frequency of the emergence of an unfavorable condition and how much the consequences are caused and apply to all aspects of life, one of which is the construction project where the success of a construction project can be seen from how well the project is able to explore the risks that will occur, when viewed from the wide scope of the project, road construction projects have greater risks than building construction projects. The Gilimanuk – Mengwi toll road project is planned to be the second toll road to be built on the island of Bali which has a length of 96.21 km and passes through 3 regencies using a concession scheme with the aim of development to facilitate the flow of logistics transportation on the island of Bali.This study aims to determine the risk of building the Gilimanuk - Mengwi toll road and mitigate the risk that is included as a high risk criteria. The data collection method was carried out with literature studies and interviews using the questionnaire of the selected respondents, namely PUPR Bina Marga who will be directly involved in the implementation of the project. Process the risk level determination data using the probability x impact matrix with the Likert assessment scale. The results were obtained that there were 4 criteria and 12 sub-criteria of risk that were included as high risk with mitigation in general namely strengthening coordination between stakeholders in the preconstruction, always refer to the applicable rules and the application of technical implementation in the field practically and efficiently.

References

Adnyana, Ida Bagus Rai, Joni, Gde Putu, Asmara, A.A. Gde, Sudarsana, Dewa Ketut. 2015. Identifikasi dan Penilaian Resiko pada Pelaksanaan Proyek Peningkatan Jalan Nasional di Provinsi Bali. Jurusan Teknik Sipil, Universitas Udayana

Dradjad SutJahjo, Kusumo, Setiyadi, 2016. Aspek Hukum Terhadap Kegagalan Pelaksanaan Pekerjaan Konstruksi Proyek Di Jakarta Terhadap Waktu Dan Biaya Pekerjaan Konstruksi. 2016. Politeknik Negeri Jakarta : Politeknologi Vol.15 No.1

Dwifajryn , A.Alfitra, Wiguna, I Putu Artama, 2014. Analisis Risiko Public Private Partnership (PPP) Build Operate Transfer (BOT) TPA X Kota Y, MMT-ITS: Prosiding Seminar Nasional Manajemen Teknologi XXI

Harahap, Kaje, Nurcahyo, Cahyono Bintang, Putri, Yusroniya Eka, 2013. Analisa Resiko Proyek Pembangunan Jalan Tol Nusa Dua - Ngurah Rai - Benoa, Bali. Jurusan Teknik Sipil, ITS

Sandyavitri, Ari, 2008. Pengendalian Dampak Perubahan Desain. Fakultas Teknik Universitas Riau: Jurnal Teknik Sipil Volume 9 No.1

Susilo Saputro, Kardian, 2017. Evaluasi Dan Analisis Risiko Terhadap Biaya, Waktu Dan Mutu Konstruksi JLS Kabupaten Lumajang-Kabupaten Jember. Master Thesis, institute Teknologi Sepuluh Nopember

Downloads

Published

2023-04-28

How to Cite

Surya, A. B. O. K., Ermanto, S. A., Mulyaningtyas, D. O., & Putra, A. G. S. . (2023). Risk Analysis of Construction Work for the Construction of Gilmanuk - Mengwi Toll Road, Bali Province. Jurnal Teknologi Transportasi Dan Logistik, 4(1), 11-20. https://doi.org/10.52920/jttl.v4i1.95

Issue

Section

Articles

Most read articles by the same author(s)